Uzbekistan has become one of the fastest-growing solar markets in Central Asia. In 2019, the country had no large-scale solar power plants in operation, according to the International Energy Agency. By the end of 2025, cumulative installed PV had reached 5.93 GW, according to IRENA data reported by pv magazine.
This guide looks at solar power plants in Uzbekistan in 2026. It explains the country's installed capacity, its 2030 renewable energy targets, the major projects, and the challenges of operating plants in local conditions.
How much solar power does Uzbekistan have?
By the end of 2025, Uzbekistan had about 5.93 GW of installed solar PV capacity, according to IRENA. This includes both utility-scale solar plants and a growing number of rooftop systems.
The wider power system is growing at the same time. Uzbek authorities estimated total installed generating capacity at 25.8 GW at the end of 2025, up from 21.9 GW a year earlier, with renewables at 8 GW, or about 31% of the total, according to Enerdata. For 2026, the government planned to commission another 2.8 GW of solar as part of 6.7 GW of new capacity, which also includes 884 MW of energy storage.
Uzbekistan's renewable energy targets for 2030
Uzbekistan has increased its renewable energy targets several times as more projects have moved forward.
| Period | Target | Source |
| 2020 Concept Note | 5 GW of solar by 2030 and at least 25% renewables in generation | IEA |
| January 2024 | 27 GW of renewable capacity and 40% of electricity from renewables by 2030 | Enerdata |
| 2025 to 2026 | 25 GW of solar and wind by 2030, with renewables reaching 54% of generation under the "Uzbekistan 2030" strategy | pv magazine, Euronews |
Different sources report different targets, depending on the announcement and year. But the overall plan is clear: Uzbekistan aims to add substantial solar and wind capacity by 2030 and rely less on natural gas for electricity.
Major solar power plants in Uzbekistan
Uzbekistan's first utility-scale solar power plant opened in August 2021. The 100 MW Karmana project is in the Navoi region. Since then, international independent power producers have developed more large solar projects, many through government tenders.
| Plant | Region | Capacity | Notes |
| Karmana (Nur Navoi) | Navoi | 100 MW | First utility-scale plant, operating since August 2021 (IEA) |
| Samarkand | Samarkand | 220 MW | Awarded through the government tender program (IEA) |
| Jizzakh | Jizzakh | 220 MW | Awarded through the government tender program (IEA) |
| Nurata | Navoi | 200 MW | Awarded through the government tender program (IEA) |
| Sherabad | Surkhandarya | 457 MW (Phase I) | Tariff of USD 18.045/MWh including transmission lines (IEA) |
| Nur Bukhara | Bukhara | 250 MW with 63 MW / 126 MWh battery | The country's first utility-scale solar-plus-storage plant (ESG News) |
| Guzar | Kashkadarya | 300 MW with storage | Construction launched (ESG News) |
| New Silk Road | Samarkand (Chopan-Ota) | 20 MW | Hosted an on-site autonomous O&M demonstration with Areg.AI in October 2026 (Areg.AI) |
Solar projects are moving quickly in Uzbekistan. This table highlights major named projects, rather than every plant in the country.
How solar projects are procured: tenders, PPAs and tariffs
Since 2019, Uzbekistan has awarded large solar projects through competitive tenders run with support from the World Bank Group, the Asian Development Bank and the EBRD, according to the IEA. The early rounds covered ten projects with a combined 2,050 MW, mostly in the southern and south-western regions.
For investors, three features of these tenders matter:
- Long contracts. Awarded projects have 25-year power supply periods.
- Low tariffs. Reported prices range from about USD 17.9 to 26.8 per MWh. This means operators must keep running costs under control.
- International support. Development banks and other multilateral partners have helped attract developers and lenders.
Low tariffs and long contracts make efficient operations especially important. When every megawatt-hour is sold at around USD 20, the only way to protect returns over 25 years is to keep availability high and operating costs low. Our guide to how to calculate solar IRR shows how sensitive project returns are to small changes in yield and OpEx.
Distributed solar: the Solar House program
Alongside utility-scale plants, Uzbekistan has built a large base of small-scale solar. Under the Solar House net metering program, 2,508 MW of PV was installed between April 2023 and August 2026, including 509.7 MW in the first eight months of 2026, according to Ministry of Energy figures reported by pv magazine. The government expected about 700 MW to be commissioned under the program in 2026.
What it takes to operate a solar power plant in Uzbekistan
Building a solar plant is only the beginning. Operators must keep it performing well throughout a contract that can last 25 years. Uzbekistan's climate and the size of its plants make that work challenging.
Dust and soiling
Much of Uzbekistan's solar capacity sits in dry, dusty regions. A 2025 simulation study of PV performance in Tashkent's climate, published in E3S Web of Conferences, found that optical transmittance fell to 30% at a dust load of 10 g/m², with module output dropping by more than 60% at heavy dust levels. Real-world losses depend on cleaning frequency, but the study shows how quickly soiling can erase yield if it is not managed. Our article on the real cost of solar soiling explains how to put a value on those losses.
Cleaning strategy matters as much as cleaning frequency. Hauling water to large remote sites adds cost and logistics, which is why water-free robotic cleaning is a strong fit for plants in arid regions. Areg.AI's CBOT performs water-free cleaning, so cleaning cycles do not depend on water deliveries to the site.
Heat
The same study modeled module temperatures of 60°C to 80°C and found that voltage fell as temperatures increased. Summer heat also puts pressure on inverters and other electrical equipment. Monitoring and timely repairs are therefore important.
Scale and distance
Plants of 200 to 450 MW spread over large areas and are often far from major cities. Manual inspection of every string, combiner box and tracker takes crews weeks, and faults found late cost generation. Autonomous inspection changes the math. Areg.AI's SOBOT carries out autonomous inspection and monitoring on the ground, while drone thermal scans through Aerial Diagnostics cover the whole field from the air.
Vegetation
Seasonal growth around rows and equipment shades modules and adds fire fuel. Scheduled robotic mowing with MOWBOT keeps it under control without waiting for contractor crews.
Grid integration
The IEA identifies reliable electricity networks as essential to Uzbekistan's renewable energy growth. Grid modernization is also a government priority. As more solar and storage connect, operators need accurate data and fast response to grid events, which puts the quality of a plant's SCADA and control room at the center of operations.
Autonomous O&M in Uzbekistan
Areg.AI finalized its first deployments in Uzbekistan in 2026, expanding beyond its operational base in Armenia. In October 2026, Areg.AI hosted an on-site demonstration for regional solar partners at the 20 MW New Silk Road plant in Chopan-Ota, Samarkand region, showing SOBOT inspection, MOWBOT grass cutting and CBOT dry cleaning in the field, along with the platform's monitoring, Digital Twin and task management.
This approach fits large plants in markets with low tariffs, such as Uzbekistan. Robots handle repetitive inspection, cleaning and mowing, the platform turns detected anomalies into work orders automatically, and crews focus on the repairs that need people. You can read more about this approach in our article on the solar robotics autonomous fleet.
What this means for investors and operators
- A growing market. Uzbekistan had almost 6 GW of installed solar capacity at the end of 2025, with more projects planned for 2026.
- Operations affect returns. At tariffs of around USD 20 per MWh, losses from dust, heat and slow repairs can add up over a 25-year contract.
- More energy storage. Solar-plus-storage plants and standalone batteries are becoming part of the project pipeline, adding new operating needs.
- Automation fits local conditions. Large sites, dust and high temperatures make autonomous inspections, water-free cleaning and faster work orders useful.
Frequently asked questions about solar power plants in Uzbekistan
How many solar power plants are there in Uzbekistan?
Uzbekistan has several utility-scale solar plants of 100 MW or more, as well as thousands of rooftop installations under the Solar House program. Total installed solar PV capacity reached about 5.93 GW by the end of 2025, according to IRENA.
When did Uzbekistan's first solar power plant open?
Uzbekistan's first utility-scale solar power plant opened in August 2021. It is the 100 MW Karmana project in the Navoi region.
What is Uzbekistan's renewable energy target?
Uzbekistan has announced targets of around 25 to 27 GW of renewable capacity by 2030. Its electricity-generation targets include 40% renewables in 2024 announcements and 54% in the later Uzbekistan 2030 strategy.
Is Uzbekistan good for solar energy?
Yes. The IEA reports median global horizontal irradiance of 4.52 kWh/m² per day, with higher levels in the south. The main challenges for operators are dust, summer heat and the large size of many plants.