Areg AI is now live at the Bari Arev solar plant in Gegharkunik. The 5.558 MWp facility extends the Areg AI network into one more site in eastern Armenia. The plant now runs on the Areg AI platform, which manages solar operations to lift output and cut running costs.
What Areg AI brings to the plant
Areg AI runs Bari Arev on its full-stack platform, which moves solar operations from reactive to autonomous. Aerial and ground inspection and a live digital twin keep a full picture of the site. The analytics and forecasting layer then catches faults early and predicts performance, so problems surface before they cost energy.
From there, the platform puts Areg AI’s robotics fleet to work on the ground, from autonomous inspection to water-free cleaning and vegetation control. The SCADA layer ties it together, so a fault detected in software becomes a work order and then action in the field.
The measurable impact
The deployment targets three results. Areg AI expects at least 10% more energy production, at least 15% lower operational costs, and stronger long-term resilience. Those gains come from catching faults early and running maintenance before failures.
Bari Arev solar plant joins a growing network
Bari Arev joins the Heritage and A-S Energy plants as part of Areg AI’s growing footprint in Gegharkunik. More Armenian solar plants keep coming online across the network.
See every plant Areg AI runs on our News page, or book a demo to find out what the platform would deliver on your own site.
